AWS – Commssioning and modifications to wave energy device
Working as a contractor to Sequentec, I produced the detailed design for several PLC system panels used on this prototype wave energy device. Later, I was asked to commission the electrical equipment and cabling during assembly at the structural fabricators in Glasgow. To do this I needed to produce commissioning … Continue reading






